E. A. Ozer And T. SARAÇ, "MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints," TOP , vol.27, no.1, pp.94-124, 2019
Ozer, E. A. And SARAÇ, T. 2019. MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints. TOP , vol.27, no.1 , 94-124.
Ozer, E. A., & SARAÇ, T., (2019). MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints. TOP , vol.27, no.1, 94-124.
Ozer, Emine, And TUĞBA SARAÇ. "MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints," TOP , vol.27, no.1, 94-124, 2019
Ozer, Emine A. And SARAÇ, TUĞBA. "MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints." TOP , vol.27, no.1, pp.94-124, 2019
Ozer, E. A. And SARAÇ, T. (2019) . "MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints." TOP , vol.27, no.1, pp.94-124.
@article{article, author={Emine Akyol Ozer And author={TUĞBA SARAÇ}, title={MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints}, journal={TOP}, year=2019, pages={94-124} }