S. HASGÜL And Z. KARTAL, "Analyzing a drum buffer rope scheduling system executability through simulation," Summer Computer Simulation Conference 2007 , vol.1, San Diego, United States Of America, pp.1243-1249, 2007
HASGÜL, S. And KARTAL, Z. 2007. Analyzing a drum buffer rope scheduling system executability through simulation. Summer Computer Simulation Conference 2007 , (San Diego, United States Of America), 1243-1249.
HASGÜL, S., & KARTAL, Z., (2007). Analyzing a drum buffer rope scheduling system executability through simulation . Summer Computer Simulation Conference 2007 (pp.1243-1249). San Diego, United States Of America
HASGÜL, SERVET, And ZUHAL KARTAL. "Analyzing a drum buffer rope scheduling system executability through simulation," Summer Computer Simulation Conference 2007, San Diego, United States Of America, 2007
HASGÜL, SERVET And KARTAL, ZUHAL. "Analyzing a drum buffer rope scheduling system executability through simulation." Summer Computer Simulation Conference 2007 , San Diego, United States Of America, pp.1243-1249, 2007
HASGÜL, S. And KARTAL, Z. (2007) . "Analyzing a drum buffer rope scheduling system executability through simulation." Summer Computer Simulation Conference 2007 , San Diego, United States Of America, pp.1243-1249.
@conferencepaper{conferencepaper, author={SERVET HASGÜL And author={ZUHAL KARTAL}, title={Analyzing a drum buffer rope scheduling system executability through simulation}, congress name={Summer Computer Simulation Conference 2007}, city={San Diego}, country={United States Of America}, year={2007}, pages={1243-1249} }