Articles
29
All (29)
SCI-E, SSCI, AHCI (19)
SCI-E, SSCI, AHCI, ESCI (23)
ESCI (4)
Scopus (22)
TRDizin (3)
Other Publications (2)
3. RESERVE ESTIMATION OF CAYIRHAN B LIGNITE FIELD ACCORDING TO THE UMREK CODE
Eskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi (online)
, vol.32, no.1, pp.1230-1242, 2024 (TRDizin)
6. Grid Search Optimised Artificial Neural Network for Open Stope Stability Prediction
International Journal of Mining, Reclamation and Environment
, vol.35, pp.600-617, 2021 (SCI-Expanded, Scopus)
7. Grade estimation by a machine learning model using coordinate rotations
Applied Earth Science: Transactions of the Institute of Mining and Metallurgy
, vol.130, pp.57-66, 2021 (ESCI, Scopus)
10. Kazı Arını Tasarımında Ampirik Yaklaşımların Kullanımı
Çukurova Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi
, vol.34, no.4, pp.231-242, 2019 (TRDizin)
12. Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine
International Journal of Mining, Reclamation and Environment
, vol.31, no.6, pp.389-403, 2017 (SCI-Expanded, Scopus)
13. The application of the analytic hierarchy process (AHP) and Yager's method in underground mining method selection problem
INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT
, vol.29, no.6, pp.453-475, 2015 (SCI-Expanded, Scopus)
15. Equipment selection based on the AHP and Yager's method
JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY
, vol.115, no.5, pp.425-433, 2015 (SCI-Expanded, Scopus)
16. Application of the TOPSIS Method to Solve Some Decision Making Problems in Mining Operations
Yeraltı Kaynakları Dergisi / Journal of Underground Resources
, vol.2, pp.21-34, 2012 (Peer-Reviewed Journal)
22. Selection of plant location in the natural stone industry using the fuzzy multiple attribute decision making method
JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY
, vol.108, no.10, pp.641-649, 2008 (SCI-Expanded, Scopus)
28. A decision support system for underground mining method selection
Lecture Notes In Computer Science
, vol.4570, pp.334, 2007 (Scopus)
29. Tam Mekanize Uzunayaklarda Tur Zamanı Hesaplamaları
Osmangazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi
, vol.8, pp.14-16, 2002 (Peer-Reviewed Journal)
Papers Presented at Peer-Reviewed Scientific Conferences
42
3. The Implementatıon of the Different Stope Boundary Optimızation Studies in an Existing Underground Mine
Canadian Institute of Mining, Metallurgy and Petroleum (CIM)Convention Expo, 30 April - 03 May 2017, (Summary Text)
4. Üç Farklı Kazı Arını Optimizasyon Yönteminin Var Olan Bir Madene Uygulanması ve Sonuçların Karşılaştırılması (Kazı Arını Sınırlarının Optimizasyonuna Örnek Bir Uygulama)
Türkiye 25. Uluslararası Madencilik Kongresi ve Sergisi, Antalya, Turkey, 11 - 14 April 2017, (Full Text)
6. Implementation and Comparison of Four Stope Boundary Optimisation Algorithms in an Existing Underground Mine
6th International Conference on Computer Applications in the Minerals Industries, 5 - 07 October 2016, (Full Text)
9. Determinatıon of Optimum Coal Mining Policy in Turkey By Using Analytical Network Process
2015 Aachen International Mining Symposium, Aachen, Germany, 27 - 28 May 2015, (Full Text)
11. Türkiye de Maden Mühendisliği Eğitiminin Analitik Serim Süreci ile Analizi
Türkiye 24. Uluslararası Madencilik Kongresi ve Sergisi, Antalya, Turkey, 14 - 17 April 2015, (Full Text)
12. Determination of Fully Mechanized Underground Coal Panels Optimum Dimensions for Retreat Caving Method
2014 Aachen International Mining Symposium, Aachen, Germany, 11 - 12 June 2014, (Full Text)
14. Reclamation Project Selection an an Open Pit Mine by Using Fuzzy AHP
23rd World Mining Congress, Montreal, Canada, 11 - 15 August 2013, (Full Text)
15. Bir Açık İşletmede Doğaya Yeniden Kazandırma Projesi Seçimi
23rd International Mining Congress and Exhibition of Turkey, Antalya, Turkey, 16 - 19 April 2013, (Full Text)
16. Optimum location selection for coal preparation plants by using analytic hierarchy process method
23rd International Mining Congress and Exhibition of Turkey, Antalya, Turkey, 16 - 19 April 2013, (Full Text)
17. Determination of Optimum Coal Panel Dimensions for Fully Mechanized Underground Coal Mine in Western Lignite Colliery
23rd International Mining Congress and Exhibition of Turkey, Antalya, Turkey, 16 - 19 April 2013, (Full Text)
20. Bulanık AHS Yöntemi ile Açık Ocak Kamyonu Seçimi
Türkiye 22. Uluslararası Madencilik Kongresi, Ankara, Turkey, 11 - 13 May 2011, (Full Text)
21. Ekipman Seçiminde Farklı Çok Nitelikli Karar Verme Yöntemlerinin Kullanımı ve Değerlendirilmesi
3. Maden Makinaları Sempozyumu, İzmir, Turkey, 5 - 06 May 2011, (Full Text)
22. Marble Potential Mining and Policy of Turkey
2011 SME Annual Meeting, DENVER, United States Of America, 27 February - 02 March 2011, (Full Text)
25. Bir Mermer Fabrikasında Kusurlu Fayans Üretiminin İstatistiksel Süreç Kontrol Yöntemleri İle Analizi
2. Maden Makinaları Sempozyumu, Zonguldak, Turkey, 4 - 06 November 2009, (Full Text)
26. TOPSIS Tekniği Kullanarak Hidrolik Yerkazar Seçimi ve Duyarlılık Çözümlemesi
21th International Mining Congress and Exhibition of Turkey, Antalya, Turkey, 6 - 08 May 2009, (Full Text)
27. Underground Mining Method Selection By Using Multiple Attribute Decision Making Methods
2009 SME Annual Meeting, DENVER, United States Of America, 22 - 25 February 2009, (Full Text)
28. An Application of the TOPSIS Method to Solve Hydraulic Excavator Selection Problem in Mining
2008 SME Annual Meeting, SALT LAKE CITY, United States Of America, 24 - 27 February 2008, (Full Text)
29. An Equipment Selection Application Using the AHP Method
2007 SME Annual Meeting, DENVER, United States Of America, 25 - 28 February 2007, (Full Text)
32. Diskli Blok Kesme Makinalarındaki Kayıpların Shewhart Kontrol Grafikleri İle Belirlenmesi
Türkiye V. Mermer ve Doğaltaş Sempozyumu, AFYON, Turkey, 2 - 03 March 2006, (Full Text)
33. Tam Mekanize Uzunayaklarda Üretimi Etkileyen Faktörler
Türkiye 18. Uluslararası Madencilik Kongresi ve Sergisi Konferansı, 10 - 13 June 2003, pp.347-349, (Full Text)
37. Minimizing Longwall Move Time by Using Microsoft Project
30th Application of Computers and Operations Research in the Mineral Industry, PHOENIX, United States Of America, 3 - 06 March 2002, (Full Text)
38. GLİ Ömerler Mekanize Ayakta Tur Zamanına Göre Kazı Yöntemi Seçim
Türkiye 17. Uluslararası Madencilik Kongresi, Ankara, Turkey, 19 - 22 June 2001, (Full Text)
41. Ömerler Mekanize Ayakta Yürüyen Tahkimatlardaki Basınçların İzlenmesi ve İncelenmesi
V. Ulusal Kaya Mekaniği Sempozyumu, Isparta, Turkey, 30 - 31 October 2000, (Full Text)
Books
2
2. Plant Location Selection in Natural Stone Industry
in: Key Engineering Materials, Rosa, LG; Silva, ZCG; Lopes, L, Editor, TRANS TECH PUBLICATIONS LTD, LAUBLSRUTISTR 24, CH-8717 STAFA-ZURICH, SWITZERLAND, pp.371-378, 2013